CustomerMittal Steel LocationEast Chicago, Indiana Capacity50 MW electric Project DescriptionMittal Steel (formerly International Steel Group (ISG)) and Primary Energy partnered to develop additional on-site energy capacity, reducing energy costs and providing a more reliable, secure source of power and steam for Indiana Harbor Works. Mittal Steel needed to retire an existing onsite blast furnace gas recovery boiler and address an opportunity to recover additional blast furnace gas. Primary Energy installed and owns a 50 MW comined heat and power (CHP) facility comprised of a blast furnace gas recovery boiler and a condensing steam turbine. Commercial OperationDecember 2002 BenefitsThe Ironside Energy CHP facility allows Mittal Steel to capture and beneficially use practically all of the by product gas that would otherwise be flared, thereby producing useful electricity and reducing net pollution into the environment. |
|